GT1 (Russian: ГТ1code: rus promoted to code: ru , later GT1h — gazoturbovoz, type 1, hybrid) is a class of Russian mainline dual-unit freight gas-turbine–electric locomotives, manufactured in Russia by Zheldorremmash at Voronezh Locomotive Plant and by Sinara Group at Lyudinovsky Locomotive Plant. The locomotive uses an AC/DC electric transmission: the gas turbine engine running on liquefied natural gas is connected to an alternating current generator, and the current produced by it is rectified to direct current and supplied to the traction electric motors, which drive the locomotive. A unique feature of the locomotive's design is the placement of a single gas turbine unit on only one of its units, while the fuel compartment is on the other unit, with both units being the traction units. GT1 is the most powerful gas-turbine locomotive in the world.
A total of two fundamentally different design variants of this series were built, each of which produced a single locomotive. The first locomotive was modernized in 2007 at the Voronezh Locomotive Repair Plant from a VL15 electric locomotive with six-axle units, and the second was built at the Lyudinovo Locomotive Building Plant based on a running gear similar to the eight-axle TEM7 and TE8 locomotives and a body partially standardized in design with the TE8 locomotive and the 2ES6 electric locomotive. After undergoing testing, both locomotives were assigned to the Yegorshino depot on the Sverdlovsk Railway and haul freight trains on the Yegorshino–Serov section.
History
Background
From the 1940s to the 1970s, the work was actively carried out in several countries around the world to create gas turbine locomotives as an alternative to diesel locomotives. In the USSR, in the late 1950s, several models of gas turbine locomotives were developed and experimental units were built: one unit of the dual-unit freight G1 and GT101, and two single-unit passenger GP1 locomotives. However, the experimental service of these locomotives showed that in terms of fuel consumption, they exceeded diesel locomotives of similar power by more than two times. The efficiency of gas turbine engines produced at that time was low (about 15%), as a result of which the cost of the fuel they consumed was comparable to that of diesel locomotives, but the fuel supply was used up more quickly. At the same time, gas turbines were significantly more expensive to produce than diesel engines, and due to the use of low-quality fuel, they quickly became contaminated and required frequent maintenance. By this time, the production of sufficiently powerful diesel engines had already been mastered, so gas-turbine ships were no longer produced in the USSR and work on their development was discontinued.
In the 21st century, the cost of producing gas turbine engines has decreased due to their large-scale serial production for jet aircraft, gas pumping units, and gas-fired power plants. At the same time, their efficiency has increased thanks to design improvements and the use of more heat-resistant materials, which allow for higher gas combustion temperatures, thereby increasing the engine's efficiency to 30%. This has increased interest in using such engines in rail transport due to their higher specific power compared to internal combustion piston engines, the possibility of using cheaper low-grade fuel, an extended service life due to fewer moving parts, and significantly reduced carbon deposits.
One of the reasons that increased interest in the development of gas turbine locomotives in Russia was the increase in freight traffic on Russian railways, which led to the need to increase either the length and weight or the number of freight trains, as well as their speeds. To operate trains with increased weight, it was necessary either to use a larger number of locomotive units in the consist or to develop locomotives with more powerful power units. However, the possibility of developing powerful diesel locomotives was greatly limited compared to electric locomotives due to the need to accommodate a primary power unit with a larger and heavier cooling system and fuel tank. This led to the need to reconfigure heavy freight trains at the junctions of electrified and non-electrified railway sections, increasing their downtime at stations, or to use several diesel locomotives in a single train, which required an increase in the locomotive fleet and operational costs for their maintenance and repair. The use of a gas turbine instead of a diesel engine made it possible to create an autonomous locomotive, similar in weight to standard diesel locomotives, but significantly superior in power, comparable to that of mainline electric locomotives.
Another reason was the problem of the depletion of global oil reserves and the increase in diesel fuel prices, which led to higher costs for freight transport on non-electrified railway lines, as well as the problem of environmental pollution from combustion products of liquid hydrocarbons. In this regard, the issue of developing locomotives using cheaper and environmentally friendly types of fuel began to be considered at JSC "Russian Railways". In the energy strategy of Russian Railways, it was decided to gradually convert part of the locomotive fleet to natural gas (methane), which is available in large quantities in Russian deposits. The main drawback of this type of fuel is its low density, and in order to store a sufficient amount of gas on board a locomotive, it is necessary either to compress it to a very high pressure (up to 200 atmospheres), which requires the use of heavy thick-walled tanks and is therefore unsuitable for mainline locomotives, or to liquefy it by cooling it to a temperature below -161 °C, which allows reducing the gas volume by approximately 600 times. At the same time, the production cost of even liquefied natural gas (LNG) is almost half that of diesel fuel, which allows reducing operating costs.
However, the liquefied natural gas (LNG) occupies twice the volume of diesel fuel of the same mass and requires a specially insulated cryogenic tank for its storage, which must be more than twice the volume of standard fuel tanks to store a sufficient amount of fuel on board the locomotive. Due to its large volume, the LNG fuel tank cannot be located in the same unit of the mainline locomotive as the power units and requires an additional tender unit. In order to accommodate traction electric motors in this unit for a more efficient use of the locomotive's adhesive weight, the primary power unit in the other unit must provide high power, which can be achieved by using a gas turbine instead of a gas piston or gas diesel engine. Moreover, the use of a gas engine, and particularly a gas turbine, allows for a reduction in the amount of harmful emissions into the atmosphere compared to a diesel engine.
In this regard, the management of Russian Railways deemed it appropriate to create a mainline gas turbine locomotive capable of hauling trains of the same mass as standard mainline electric locomotives and operating on liquefied natural gas.
First locomotive
In the beginning of 2005, commissioned by the Russian Railways, the All-Russian Scientific Research and Design-Technological Institute (VNIKTI) in Kolomna began the development of the GT1 mainline dual-unit freight gas-turbine locomotive with electric transmission, having a nominal gas turbine engine power of 8,300 kW (11,100 hp) and using liquefied natural gas (LNG) as fuel, which is regasified before being supplied to the gas turbine. To accommodate the cryogenic tank with LNG, a significant volume was required; therefore, it was decided to place it and the power unit in different units, which simplified their maintenance. Such an arrangement was previously used on experiental Soviet diesel locomotives 2TE10G and 2TE116G, between the main units of which a tender unit with a cryogenic tank without traction motors was coupled, as well as on American gas-turbine freight locomotives, to which a tender unit in the form of a fuel oil tank was attached at the rear. The difference of the new gas-turbine locomotive from the experimental locomotives was that its traction motors were also placed on the tender unit with fuel capacity, as a result of which it became a booster unit. In addition, an auxiliary diesel generator, used to start the gas turbine and to move the locomotive without load for fuel-saving purposes, was supposed to be placed on this unit.
In order to accelerate the process of developing a new gas-turbine locomotive, it was decided to use the body and crew compartment of an existing locomotive. For the latter, a dual-unit twelve-axle VL15 series freight electric locomotive was chosen, which had sufficient unit length to accommodate a gas-turbine power plant and the appropriate total traction motor power. These electric locomotives were produced in the second half of the 1980s by the Tbilisi Electric Locomotive Plant, while their body and bogies were manufactured by the Novocherkassk Electric Locomotive Plant. In January 2005, the Chelyabinsk Electric Locomotive Plant began preparations for the modernization of electric locomotive VL15-008, which was built in 1987 and previously operated on the October Railway, dismantling all main electrical equipment from the body and the roof. In June of the same year, the disassembled locomotive was sent for further conversion into a gas-turbine locomotive at the Voronezh Locomotive Plant.
At the same time, in March 2005, the work began on selecting components for the future gas turbine locomotive. A total of 54 industrial companies were involved in the development of the gas turbine locomotive and its equipment, 90% of which were companies from Russia. VNIKTI became the lead developer of the project and technical documentation for the locomotive and coordinated the work on its assembly and component manufacturing, as well as created the microprocessor control system and software. The modernization of the locomotive, installation of equipment, and production of a number of new mechanical components were carried out by the Voronezh Locomotive Repair Plant. The gas turbine engine was manufactured by the Samara Scientific and Technical Complex named after N. D. Kuznetsov, the traction and auxiliary generators — by LLC “Elektrotyazhmash-Privod” (Lysva), the cryogenic tank — by JSC “Uralkriomash” (Nizhny Tagil), and the new control cab — by NPP “Polyot” (Obninsk). During the development of the gas turbine locomotive, the companies conducted a complex range of scientific research and experimental design works to create a methane-fueled gas turbine and a high-speed traction generator driven by it without a gearbox, a fuel supply and gasification system with minimal preparation time, a microprocessor control and diagnostic system, as well as the equipment layout.
Since the calculated output power of the gas-turbine locomotive's traction motors was lower than that of the original electric locomotive, an attempt was made to replace the locomotive TL-3B's original traction electric motors with the lighter and less powerful NB-420B electric motors from VL82 electric locomotives. However, spare motors were not available, and it was decided to dismantle them from two VL82 electric locomotives that were in relatively good technical condition. During the re-equipment process, it turned out that these motors were unsuitable, and ultimately the gas-turbine locomotive retained its original type of motors. Meanwhile, the VL82 electric locomotives used as temporary donor sources for the motors were, for an unknown reason, decided to be sent for scrap.
When selecting a gas turbine, specialists from VNIKTI studied several models of gas turbine engines produced by Russian companies, including FSUE "Salute", JSC "Aviamotorny Scientific and Technical Complex "Soyuz"" (Moscow), JSC "Aviadvigatel" (Perm), and JSC "Samara Scientific and Technical Complex named after N. D. Kuznetsov" (Samara). The choice was made in favor of the Samara company, which had experience in developing, in the late 1980s and early 1990s, an aircraft turbojet engine that operated on liquefied hydrogen and liquefied methane. A design feature of the engine was the gasification of cooled liquid fuel through heating by hot exhaust gases in the turbine exhaust pipe without the use of intermediate heat carriers, which increased the efficiency of the fuel gas preparation process. Experimental engines were used on the prototype passenger aircraft Tu-155 (an analogue of the serial Tu-154 with kerosene engines), but proved to be unclaimed in aviation. However, the experience gained proved useful in the development of a gas turbine engine for a locomotive.
The main work on the development of the NK-361 gas turbine engine for a locomotive based on serially produced aircraft engines was carried out by specialists at the Kuznetsov SNTK in 2005. In the beginning of 2006, tests of the gas generator began, followed shortly by tests of the entire gas turbine engine. During the turbine manufacturing process, its individual components were tested, including the combustion chamber during startup on cold gas. Shortly thereafter, the company Elektrotjazhmash-Privod manufactured a high-speed traction generator for this turbine, which after factory testing, was delivered to the Samara plant in the summer of the same year. Final stand idle resistance tests of the gas turbine and generator were conducted in December 2006. During the tests, 73 engine startups were conducted, during which the operation of the fuel system from the cryogenic tank to the gas turbine was checked, as well as the operation of the oil systems of the gas turbine and generators, debugging of the gas turbine engine cold start with an output to nominal rotational speed, determination of the main parameters of the engine, traction and auxiliary generators under different load conditions from idle to maximum, and assessment of engine vibrations. The tests confirmed the expected characteristics of the engine; however, the system for regulating operating modes required refinement.
During the process of converting the electric locomotive into a gas-turbine locomotive at the Voronezh Plant, the bogies and the locomotive body underwent major repairs; at the same time, the original metal cabs were cut off and replaced with new semi-aerodynamic fiberglass cabs, similar to the cabs of ES4K and ES5K locomotives. The roof of the body was also cut off to be replaced with a new, taller modular one, and air intake grilles and hinged doors were cut into the side walls for access to equipment from the outside, while some windows were removed. By the end of 2006, the gas turbine locomotive was almost fully assembled, and the final equipment installation was completed in the spring of 2007. The locomotive received a red paint scheme with gray and white stripes on the side, a gray roof, and a blue front panel with an orange stripe. The production cost of the gas turbine locomotive amounted to 200 million Russian rubles.
Subsequently, the GT1-001 locomotive underwent multiple modernizations at the VNIKTI facility in Kolomna, where the main modifications were made to its fuel system and control system equipment. In 2012, the gas-turbine locomotive was modernized by replacing the auxiliary diesel generator power unit with a fuel tank with a traction battery for manoeuvers with the gas-turbine engine turned off, receiving the index "h" (hybrid). At the same time, its paint scheme was slightly altered: a stripe of light green color with yellow inscriptions "СПГ-Гибрид" and "LNG-Hybrid" appeared on the lower parts of the side walls.
After the adjustment of the fuel system and the successful completion of tests of the GT1-001 gas-turbine locomotive, the Russian Railways began considering the issue of serial production of such locomotives. The Voronezh plant had only modernized an existing locomotive, and for new gas-turbine locomotives, the assembly of new bodies and crew compartments was required. It was planned to organize their production at the Novocherkassk Electric Locomotive Plant, which had previously serially produced the bodies and bogies of VL15 locomotives, as well as VL85, VL65, EP1, and EP1M locomotives with similar mechanical designs, which could ensure the development of GT1 gas-turbine locomotive production with minimal costs. However, Transmashholding, which included this plant, did not show initiative in developing the gas turbine locomotive project and required Russian Railways to independently resolve a number of issues related to the locomotive's design, as well as set the condition of creating a network of gas refueling stations along the proposed route of their service before beginning production. Since the negotiations did not lead to the expected agreements, Russian Railways decided to consider further production of gas turbine locomotives by other companies.
Second locomotive
In the beginning of 2012, the management of Russian Railways reached a preliminary agreement with the Sinara Group on the organization of mainline gas-turbine locomotive production at the Lyudinovsky Locomotive Plant, which is part of the group. Previously, this plant had produced the TGM10 shunting gas-turbine locomotive with a booster unit containing compressed natural gas cylinders. In June of the same year, the companies signed a contract, which provided for the production of a prototype locomotive in 2013, and, in case of successful testing, the organization of serial production of an additional 39 locomotives.
It was decided to develop a new gas-turbine locomotive based on the component platform of locomotives produced by the Sinara Group, for which the project was completely redesigned. As with the first locomotive, VNIKTI became the lead developer of the design and technical documentation for the new machine and coordinated the production of components and assembly of the locomotive. The design flaws of the first machine based on the VL15 were taken into account when developing a gas-turbine locomotive. It was decided to increase the fuel tank capacity on the booster unit and make it open to allow for its replacement with another tank instead of refueling, as well as to enhance safety.
In the original design, the new gas-turbine locomotive had a running gear composed of three two-axle bogies, as in the first locomotive, but using cabs and body parts standardized with the 2ES6 locomotives, produced by the Ural Locomotives plant in Yekaterinburg, which is part of the Sinara Group. However, the Lyudinovsky plant, which was entrusted with manufacturing the machine, did not produce locomotives with a running gear of this design, and in order to speed up production, it was decided to make the locomotive eight-axle based on the running gear of serially produced TEM7A, TEM14, and TE8 diesel locomotives, with two four-axle articulated bogies and a distance between coupler centers of 21,500 mm (70 ft 6 in). This led to an increase in the mass of each unit compared to the first gas-turbine locomotive, up to 184 tonnes (406,000 lb) instead of 150 (330,000); however, due to the greater number of powered axles, it was expected that the locomotive's tractive performance would improve, and the axle load decreased to 23 tonnes (51,000 lb) per axle. Despite such significant differences in design compared to the first gas-turbine locomotive, the locomotive was still assigned to the same class — GT1h.
The gas-turbine engine, as with the first locomotive, was manufactured by SNTK named after Kuznetsov; the new, improved traction generator — by LLC “Elektrotyazhmash-Privod” (Lysva); the traction electric motors — by GP “Elektrotyazhmash” (Kharkiv); the cryogenic fuel tank — by OJSC “Uralkriomash” (Nizhny Tagil); the cryogenic pump — by Fives Cryomec (Switzerland); the gas receiver and a number of fuel system components — by OJSC “Kriomash-BZKM” (Balashikha); the cab and control panel, as well as the auxiliary power converter — by NPP “Horizont” and NPO “Avtomatika” (Yekaterinburg); and the microprocessor control system was developed by VNIKTI.
In January 2013, the Lyudinovsky plant manufactured the booster unit and began construction of the traction-energy unit, which was assembled in June of the same year. The locomotive received the three-color red-gray corporate livery of Russian Railways according to a scheme similar to the 2ES6 electric locomotives: the upper half of the body in the cab area and the narrow upper stripe in the machine compartment area are painted red; the roof, narrow middle stripe in the cab area at the level of the buffer lights, which then curves upward and continues as a wide stripe in the machine compartment area, is light gray; and the frame, lower half of the rear body, track cleaner, and bogies are dark gray. The cryogenic tank was painted light gray and featured a design on both sides depicting butterflies flying over a green meadow.
Initially, the Russian Railways planned to sign a contract for the supply of 39 more GT1h gas-turbine locomotives before early 2015, to be delivered by the end of 2020. However, due to the economic crisis in Russia and the lack of infrastructure for natural gas liquefaction plants and refueling stations for these locomotives, the plans for the production of these gas-turbine locomotives were constantly cancelled and reduced in volume. In October 2016, following the tests of the GT1h-002, the Sinara Group received permission to produce a pilot series of 24 similar machines. In 2017, the assembly of the third locomotive was planned to begin, but these plans were never implemented. In 2019, Russian Railways concluded a letter of intent with the Sinara Group for the production of 23 gas-turbine locomotives by 2025; however, by mid-2020, their production had not yet started.
In the long term, the Lyudinovsky plant is considering the possibility of developing an intermediate tender unit with an additional cryogenic fuel tank for its gas turbine locomotive. This unit is planned to be coupled between the traction and booster units, enabling the operation of gas turbine locomotives without refueling over distances of up to 1,400 km (870 mi). According to the project, the unit will be shorter than the traction units and will rest on two two-axle non-powered bogies. At the ends of the tender unit, it is planned to equip compartments with cryogenic pumps, which will transfer fuel to the power unit, both from it and from the booster unit; these compartments will be equipped with side entrances and inter-sectional gangways.
General characteristics
Purpose
Mainline gas-turbine locomotives GT1 (GT1h) are designed for hauling freight trains of increased length and weight or operating in mountainous areas with complex profiles on non-electrified railway lines with a gauge of 1,520 mm (4 ft 11+27⁄32 in). They can be operated in temperate climate conditions at ambient temperatures ranging from -50 to +40 °C, while, compared to diesel locomotives, they do not require preheating of the engine in winter and are significantly more environmentally friendly in terms of harmful emissions. The nominal service life of the locomotive is 40 years.
In terms of power, the dual-unit GT1h gas-turbine locomotives are comparable to triple-unit 3TE25K/3TE25A series diesel locomotives or to a system of two dual-unit mainline diesel locomotives of the 2TE10 or 2TE116 series (in a quadruple-unit configuration), which allows their use when switching from electric to autonomous traction without reconfiguring freight trains to a lower weight or using two locomotives to haul them. Since the overall power of diesel locomotives is lower than that of electric locomotives, freight trains often have to be separated and moved in parts over non-electrified railway sections, whereas a gas turbine locomotive can transport the trains as a whole. At the same time, gas turbine locomotives are shorter and lighter than double sets of three or four diesel units of similar total power and are cheaper to maintain.
From an economic point of view, the use of gas-turbine locomotives is most advantageous in regions of natural gas production or along main gas pipelines, where inexpensive transportation and liquefaction of gas, as well as refueling station equipment along the railway network, are possible. However, due to the increased fuel consumption of gas-turbine engines at idle or under low load compared to diesel engines, the operation of gas-turbine locomotives becomes profitable only when they are used for hauling heavy trains for the majority of operational time.
Technical specifications
Design
The GT1 series of gas-turbine locomotives consists of two leading traction units — a traction-energy unit, which houses the turbo generator power plant, and a booster unit, which contains the cryogenic fuel tank. The units are standardized in the design of the crew compartments, the driver’s cabs, and partially the bodies, and they have the same length, dimensions, and service weight. However, due to the separation of the fuel tank and the power plant into different units, they cannot operate independently and are not interchangeable, unlike the diesel locomotives, which have individual engines and fuel tanks. The mechanical components of first- and second-type gas-turbine locomotives differ significantly, as do the electrical machines and devices, while the overall equipment layout, fuel system, and gas-turbine engine have similar designs.
Body
GT1 locomotives of both variants have steel wagon-type bodies with a single driver's cab in each unit and an inter-section gangway on the side opposite the cab. They consist of a main load-bearing frame, frames for attaching panels and equipment, internal partitions, side and rear panels, a modular driver's cab, and a modular roof. The bodies of the traction-energy and booster units differ from each other in a number of elements on the side and rear panels and roof, in the arrangement of internal partitions, as well as the absence of panels and roof in the area of the fuel tank on the second type of gas turbine locomotive. Between the traction-energy unit and the rear part of the booster unit, a gangway is possible via the inter-sectional transitions; however, access to the front part of the booster unit is not provided due to the cryogenic fuel tank. At the ends of the frame, SA-3 automatic couplers are installed, used for coupling the units with each other at the rear sides and for coupling the locomotive with other rolling stock at the front. The car body dimensions in both variants are 1T.
Body of the first locomotive
The body of the first GT1 gas-turbine locomotive was modified from the body of the VL15 electric locomotive. The modification involves the installation of a new driver's cab and a higher modular roof, the cutting of hatches and air intake grilles in the side panels, and a number of other design changes to them, dictated by the placement of the gas-turbine power unit, cryogenic equipment, and fuel tank in the locomotive. The original VL15 body, manufactured at the Novocherkassk Electric Locomotive Plant, is structurally close to the body of the VL85 AC electric locomotive, produced by the same plant. The length of the body of each unit is 22,530 mm (73 ft 11 in), and 21,310 mm (69 ft 11 in) between buffer beams; the width of the body at the lower part in the frame area is 3,240 mm (10 ft 8 in), and in the main part along the side panels is 3,180 mm (10 ft 5 in).
The basis of the body of each unit is a rectangular load-bearing frame, which has a welded structure and carries all types of longitudinal and transverse loads. The frame consists of two longitudinal beams made of channels and connected by 12 mm (0.47 in) thick metal sheets, transverse buffer beams that join the longitudinal beams at the ends, and truss-type transverse beams with a box section that connect the longitudinal beams at the points where the suspension elements of the body are attached to the bogies. All load-bearing elements and frame nodes are welded with continuous seams and form a power structure designed for a compressive longitudinal force of 2,940 kN (300 tf). At the end parts of the frame, boxes of the impact-absorbing apparatus with the SA-3 automatic coupler are welded into the buffer beams, and track cleaners are also attached on the cab side. The traction brackets of rear bogies are welded to the lower part of the buffer beams, while the bracket of the middle bogie is installed in the center on the lower surface of the truss-type intermediate beam. The centers of the bogies are spaced 6,765 mm (22 ft 2.3 in) apart. Below, the main reservoirs of the pneumatic system are suspended under the frame between the front and middle bogies, and between the middle and rear bogies — the battery boxes (on the booster unit of the first locomotive, prior to modernization to GT1h, a fuel tank was installed instead of external batteries).
On the GT1h locomotive of the first type, instead of the original straight cabs from the VL15 with an inclined windshield, modular semi-aerodynamic convex cabs produced by NPP “Polet” with fiberglass cladding have been installed. In terms of design, the cab of the gas-turbine locomotive is practically similar to the cabs of the ES4K and ES5K locomotive families, which were also manufactured by the same company, but in the GT1 series they have a greater height above the headlight. The cab consists of a frame made of rigid horizontal and vertical metal profiles, on the outside of which plastic fairings are installed, and on the inside — internal cladding. The front part of the cab has a curved convex shape, which protrudes the most forward at the level of the frame and buffer lights, and has an arch-shaped curve at the top, smoothly transitioning into the roof. Below the windshield, it is equipped with a reinforcing belt to reduce the degree of locomotive damage and injury to the locomotive crew in the event of a collision. It withstands a load of 290 kN (30 tf) evenly distributed across the width of the front part. Narrow corner panels are placed along the edges of the front part at a slight angle, which gradually widen upward and curve to transition into the side slopes of the locomotive roof.
The cab has a single trapezoidal windshield narrowing at the top, equipped with two wipers beneath it. On the outside of the windshield fairing, on both sides of the automatic coupler, steps are welded, and above the automatic coupler there is a recessed step, while on both sides of the buffer lights, from the middle side and slightly below the windshield in the center, there are handrails. Above the windshield in the bend zone, a trapezoidal headlight narrowing at the top is installed, recessed into the cab body and tilted backward, and on either side of the headlight there are air intake grilles, which are absent on ES4K/ES5K electric locomotives. In the middle, between the automatic coupler and the bottom of the windshield, horizontal circular buffer LED lights are arranged in pairs, integrated into a single plastic housing and similar to the buffer lights of early-production ES4K and ES5K locomotives. Red tail lights are placed at the edges, while white lights are positioned closer to the center of the cab.
Under the lower fairings, an inclined plow with six slots is attached to the front buffer beam of the frame. The plow is designed to remove foreign objects from the track and is calculated for a longitudinal force of 120–140 kN (12–14 tf) applied along its lower edge. A visor is bolted to the underside of the plow, which has five rows of bolt holes, allowing its height above the rail head level to be adjusted depending on wheel tread wear.
On the sides of the gas-turbine locomotive driver's cab, there are two side windows, similar to those on early models of the ES4K/ES5K locomotives — a triangular fixed window and a rectangular window with a downward-sliding pane, in front of which rear-view mirrors are installed. In the engine compartment area, of the three round portholes on each side of the unit that were present on the VL15, the GT1 locomotive retains only one at the front along each side of the traction-energy unit, and the middle and rear ones on the right side of the fuel booster unit, while the remaining portholes are sealed with steel plates. For entry into the locomotive, behind the driver’s cab in the main part of the body, there are single-leaf doors on each side, opening inward; moreover, compared to the VL15, the door leaves are equipped with a rectangular window. To ensure the possibility of boarding from an embankment or low platform, vertical handrails are located on the sides of the doors, a recessed step is in the middle of the side frame, and below the body under the door there is a two-step ladder.
The side panels behind the driver's cab consist of a frame made of rolled and bent profiles, sheathed with steel sheets 2 mm (0.079 in) thick. In the main part of the body, to increase the stiffness, the panels are equipped with longitudinal corrugations, while at the frame level they have a smooth surface and project 30 mm (1.2 in) on each side compared to the main panels. In the driver's cab, the height of the side panels is greater than in the main part of the body, above which the vertical part of the roof slopes is attached. Compared to the original electric locomotive, the sides of the gas-turbine locomotive have air intake grilles and hinged doors cut out, used for access to equipment from the outside and for filling the cryogenic fuel tank. At the front of each unit of the gas-turbine locomotive, at the window level on both sides, there are two ventilation grilles for the equipment chamber. In the booster unit, they are located directly behind the entrance door, while in the traction-energy unit, they are set at some distance. Further, in the traction-energy unit, opposite the main engine compartment with the gas turbine engine, at the junction of the side panel and the roof, there is a long row of ten air grilles. In the booster unit, small grilles are located on each side at mid-height in the area of the cryogenic tank. At the rear of the traction unit, on the port side near the cryogenic receiver, there are two grilles with wide slanted louvers, and at the rear of the booster unit, on the starboard side near the diesel generator or the traction battery, there is one grille.
The rear panels of the locomotive are sheathed with smooth steel sheets, while the main pneumatic system tanks that were present on the VL15 have been removed from them and relocated under the frame of the gas turbine locomotive. In the middle of the rear panels above the automatic couplers, there are inter-sectional gangways equipped with rear doors, metal transition platforms, and non-hermetic rubber bellows on the sides and above. On the left side of the inter-sectional space, assuming the traction-energy unit is at the front, nests for cryogenic liquid and gas fuel pipeline tubes are located on the rear panels at the locomotive floor level, connected by two flexible heat-insulated hoses. Slightly lower on both sides, there are sockets through which the units are connected by electrical cables.
The roof of the GT1h gas-turbine locomotive of the first type has an angular profile with a horizontal central section and sloping side slopes, and consists of separate modular panels with transverse protruding joints. Some of the roof panels are removable to allow for the installation and removal of the locomotive's internal equipment during maintenance. At the front, the roof has a rounded smooth slope with an integrated headlight and ventilation grilles on either side. Above the driver's cabs, communication antennas are installed on the roofs, while the side slopes house the air intakes for the cab's air conditioning and ventilation system. Ventilation grilles are also present in the side slopes above the rear part of the equipment compartment of the unit. On the horizontal part of the roof of the traction-energy sunit, there is a block of multi-cyclone air filters and an exhaust system grille for the spent gases.
Body of the second locomotive
The body of the GT1h gas-turbine locomotive of the second type is similar in frame construction to the TE8 diesel locomotive, and in the design of the cabin and side panels—to the 2ES6 electric locomotive, but compared to the latter, it has a greater length, as well as the shape and height of the roof. The length of the body of each unit is 21,500 mm (70 ft 6 in), and 20,366 mm (66 ft 9.8 in) mm over the buffer beams; the width is 3,150 mm (10 ft 4 in).
The basis of the body of each unit is a rectangular load-bearing frame with a welded structure that absorbs all types of longitudinal and transverse loads. Structurally, the unit frame of the gas-turbine locomotive is based on the frames of TEM7 and TE8 diesel locomotives, with a number of modifications due to the placement of different equipment and the installation of a wagon-type body instead of a hood-type one. The frame consists of longitudinal backbone I-beams, shifted from the edges of the locomotive inward and connected by a deck of steel sheets 10–12 mm (0.39 in – 0.47 in) thick, peripheral channels along the edges of the locomotive, tie boxes, kingpin units, and transverse partitions forming the structural framework. The longitudinal beams are reinforced on the top and bottom by flanges and are connected at the ends by tie boxes welded to the frame's load-bearing elements, with transverse partitions of steel sheets in the spaces between the boxes, which have cutouts for the cooling air ducts of the traction motors. The side channels on the sides are connected to the ridge beams by transverse brackets, located at the top of the frame and are relatively thin compared to the beams, creating free space alongside the beams, which is partially occupied by the springs of the body suspension system on the bogies. At the rear parts of the frame, SA-3 couplers with an energy-absorbing device are installed, and on the cab side, a plow is attached to the frame. At a distance of 10,900 mm (35 ft 9 in) from each other, reinforcements for the installation of bogie kingpins have been made in the middle of the frame, and cast brackets for the suspension system have been welded to the sides of them. Under the frame of the traction-energy unit, instead of the diesel fuel tank used on diesel locomotives, a box with traction batteries is suspended in the center between the bogies, and under the frame of the booster unit — a box with cooling fans for the traction motors. Below, four main tanks of the pneumatic system are suspended longitudinally to the frame between the bogies and the central box, and on the right side under the driver's cab — a tank for the brake pneumatic system.
The GT1h type 2 gas-turbine locomotive is equipped with modular, angular-shaped cabs manufactured by NPO "Horizon" in Yekaterinburg, similar in design to the cabs of 2ES6 electric locomotives and TE8 diesel locomotives. The front of the cab features a curved profile made of two flat slanted panels with a forward-projecting bend, beneath which is located the vertical front frame panel. The front part of the cab in the area of the lower slanted panel is equipped with a reinforcing belt to reduce the extent of locomotive damage and injuries to the crew in the event of a serious collision. It can withstand a load of 290 kN (30 tf), evenly distributed across the width of the front unit.
Most of the upper panel area is occupied by the rectangular-shaped windshield of the driver's cab, equipped with two wipers beneath it. Above the windshield, a square-shaped LED spotlight with a trapezoidal frame is built into the roof. At the level between the automatic coupler and the bottom of the windshield, horizontal buffer LED lights of a circular shape are arranged in pairs on the lower part of the inclined panel, embedded in a slightly forward-protruding rectangular housing. The white lights are positioned at the edges, while the red tail lights are closer to the center of the cab, that is, opposite the arrangement of the lights on the GT1h-001. Initially, the buffer lamps were covered with rectangular frosted glass, similar to those on TE8 diesel locomotives; however, they were later removed. Between the buffer lamps, there is a plate indicating the class and number of the gas-turbine locomotive. The cab is equipped with horizontal handrail-steps, positioned centrally directly above and below the windshield, in the middle between the plate and the curve of the windshield, and below the plate.
Below the level of the cab floor is a vertically tapering front frame panel that narrows smoothly toward the bottom. A plow is attached to its lower part, serving as its continuation and also tapering downward. The plow is designed to remove foreign objects from the track and is rated for a longitudinal force of at least 137 kN (14.0 tf) applied to its lower edge. Slightly above the plow, a coupler protrudes from beneath the front frame panel, and pneumatic hose passages are located on either side of it. On the left side is the uncoupling lever, while on the right, steps are welded to it and the plow. The plow has three slanted edges at the bottom, to the lowest of which a vertical visor is bolted. The visor has three rows of bolt holes, allowing its height above the rail heads to be adjusted depending on wheel tire wear. Metal brushes for track cleaning can be installed on the plow in the area where the covers of the gear drive of wheel-motor units pass.
On the sides of the driver’s cab of the gas-turbine locomotive, there are two side windows, structurally similar to those on the 2ES6 electric locomotive — a trapezoidal fixed window and a rectangular window with a forward-sliding pane, in front of which rear-view mirrors are installed. To access the locomotive behind the driver’s cab, in the main part of the body, there are single-leaf doors with oval windows on each side, opening inward, similar to the doors of serial 2ES6 electric locomotives. To facilitate boarding from an embankment or low platform, vertical handrails are attached on either side of the doors, a step is bolted to the frame’s encasing channel, and a vertical ladder is fixed to the bogie body.
The side panels of the main body section behind the cab consist of a framework made of rolled and bent steel profiles, covered with 3 mm (0.12 in) thick steel sheets. Compared to the first locomotive, the panels have a smooth surface, while in the booster unit, in the area of the cryogenic tank, they are absent. In the panels of the main body section of both units, there are opening hatches for access to equipment from the outside, as well as ventilation grilles. In the side panels of the traction-energy unit, next to the entrance door, four ventilation grilles of the equipment compartment are built into each side under the roof. Further, at the same level, the panels of the section are bent inward at an angle to the very end of the unit, forming an air space beneath the roof air intakes. For most of the length of this bend, triple electrical busbars are laid on insulators along both sides to supply power to the booster unit. In the booster unit, the side panels of the front and rear parts are straight up to the roof. Windows are absent in all engine compartments.
The rear panels of both units of the locomotive and the intermediate panels of the booster unit at the edges of the fuel tank are sheathed with smooth steel sheets. In the middle of the rear panels above the automatic couplers, inter-sectional gangways are located, equipped with rear doors, metal transition platforms, and non-hermetic rubber bellows on the sides and above. On the sides of the inter-sectional gangway, rear sandboxes are mounted on the exterior panels. On the left side of the rear panel of each unit, at a level slightly above the locomotive frame, external sockets for the cryogenic fuel pipeline are installed, angled upwards and connected by a specially insulated U-shaped pipeline with flexible slanted pipes, the horizontal middle pipe of which is positioned transversely above the inter-sectional gangway. On the right side, beside the sandboxes, there are sockets for inter-sectional electrical connections, through which the units are connected by electrical cables suspended under the inter-sectional gangway above the automatic couplers.
The roof of the GT1h locomotive of the second type has an angular profile with a horizontal central part and sloping side slopes, and consists of separate modular panels with transverse protruding joints. Some roof panels are removable to allow for the installation and removal of the locomotive's internal equipment during maintenance. The front part of the roof above the driver's cab and the vestibule in both units has a similar design. Radio communication antennas are installed above the driver cabs on the roofs, air intakes of the cab air conditioning and ventilation system are located in the side slopes, and hatches for the front sandboxes are installed above the vestibules in the horizontal part of the roof. In the horizontal part of the traction-energy unit roof, a block of multi-cyclone air filters and a grille for the exhaust system for spent gases are installed, while under the slopes in the area of the main machinery compartment, at the bend of the side panels, air intakes for the gas turbine power plant are situated. The rear part of the roof of both units also has a similar design and is used for the installation of high-voltage inter-sectional bus ducts, which come along the sides of the traction-energy unit and extend under the booster roof.
See also
VL15 and VL85 – mainline electric locomotives, based on the design of which the first gas-turbine locomotive GT1 was developed.
Union Pacific GTELs – North American gas-turbine–electric locomotives used by Union Pacific
References
External links
GT1h – (photo gallery and assignment data). TrainPix.
GT1 photographs on "IS Locomotive"
Further reading
Muzurov, S. G. (2014). "1". Экипажная часть газотурбовоза ГТ1h-002 (in Russian). Yekaterinburg: Sverdlovsk Educational Center for Professional Qualifications.
Газотурбовоз магистральный ГТ1h-002. Руководство по эксплуатации (in Russian). Moscow: OJSC "VNIKTI". 2014.
